Article 7. ADEQUATE PUBLIC FACILITIES REQUIRED  


§ 33-7.1. Generally.
§ 33-7.1.1. Purpose.
§ 33-7.1.2. Consistency with comprehensive plan required.
§ 33-7.1.3. Water.
§ 33-7.1.4. Wastewater.
§ 33-7.1.5. Stormwater management.
§ 33-7.1.6. Streets.
§ 33-7.1.7. Parks and open space (reserved).
§ 33-7.1.8. Location of utilities.
§ 33-7.1.9. Extension and oversizing policies.
§ 33-7.1.10. Phasing.
§ 33-7.1.11. Servitudes/rights-of-way.
§ 33-7.1.12. Construction and materials.
§ 33-7.1.13. Inspections/acceptance.
§ 33-7.1.14. Maintenance.
§ 33-7.1.15. Scheduling utilities and streets.
§ 33-7.1.16. Mitigation.
§ 33-7.2. Water.
§ 33-7.2.1. Generally.
§ 33-7.2.2. Design.
§ 33-7.2.3. Construction and materials.
§ 33-7.2.4. Off-site improvements.
§ 33-7.2.5. Extension/oversizing.
§ 33-7.2.6. Water system servitudes.
§ 33-7.3. Wastewater.
§ 33-7.3.1. Generally.
§ 33-7.3.2. Sewerage facilities.
§ 33-7.3.3. Design criteria.
§ 33-7.3.4. Construction and materials.
§ 33-7.3.5. Off-site improvements.
§ 33-7.3.6. Extension/oversizing.
§ 33-7.3.7. Wastewater system servitudes.
§ 33-7.3.8. On-site wastewater systems (reserved).
§ 33-7.4. Stormwater.
§ 33-7.4.1. Purpose.
§ 33-7.4.2. Design standards.
§ 33-7.4.3. Construction and materials.
§ 33-7.4.4. Assessment of adequacy.
§ 33-7.5. Transportation.
§ 33-7.5.1. Streets, generally.
§ 33-7.5.2. Street design standards.
§ 33-7.5.3. Street construction standards.
§ 33-7.5.4. Alleys.
§ 33-7.5.5. Reserved.
§ 33-7.5.6. Traffic control.
§ 33-7.5.7. Access standards.
§ 33-7.5.8. Oversizing streets.
§ 33-7.5.9. Other improvements.
§ 33-7.5.10. Traffic impact analysis.
§ 33-7.5.11. Private streets.
§ 33-7.5.12. Conversion of public streets.
§ 33-7.6. Adequate public facilities waivers.
§ 33-7.6.1. Purpose.
§ 33-7.6.2. Applicability.
§ 33-7.6.3. Application and procedure.
§ 33-7.6.4. Required findings.
§ 33-7.6.5. Decision-maker.